PRODUCTS   PARTNERS   SUPPORT   NEWS/EVENTS   ABOUT US   HOME 
Certified Rebuild Program
Frequently Asked Questions (FAQs)
Product Manuals
Ask a Question of Allied's Technical Service Group

Related Documents
Chisel Paste Lubricant Brochure
CML II Carrier Mounted Lubrication System Brochure
Autolube IV Brochure
Get Acrobat Reader





printer-friendly
Hy-Ram® Lubrication Procedure


IMPORTANT! - All new Allied Hy-Rams must be lubricated prior to initial operation.  Failure to completely fill the reservoir can result in inadequate component lubrication and damage the tool and
bushings.

Every Hy-Ram breaker has an internal passage that the lubricant follows until it reaches the bushing(s) and tool.  On some models, this reservoir will run almost the full length of the breaker.  When a new breaker is put into service, or bushings are replaced, it is necessary to pre-fill the reservoir.  Larger breakers may require several tubes of lubricant to completely fill the reservoir.

The Allied AutoLube II and AutoLube CML are automatic lubrication systems designed with a delivery output of sufficient volume to replace the lubricant consumed during normal operation.  However, the outputs of these systems are not designed to allow an empty hammer reservoir to be filled and maintain proper lubrication simultaneously.  Use the attached tables to determine the correct position for lubricating each specific Hy-Ram model or series.  Lubricant should be injected until it emerges from the lower wear bushing or tool retainer openings.

Before the Breaker is Lubricated it Must be Properly Positioned

Table 1 / Figure 1 - All current production breakers are lubricated by standing the hammer vertically on the chisel tool and applying contact pressure to fully seat the tool.

Lubricate these Hy-Ram models VERTICALLY
700B 740 Series 780 Series
711B 745 Series 785CS
715, B 750 Series 790 Series
725, B 755CS 795CS
730 99 797CS
775CS 805CS  

Refer to the specific model Operator’s Manual for further information on lubrication. 

Table 2 / Figure 2 - With certain non-current hammer models, the breaker is positioned horizontally and lubricated with the tool freely out.

Lubricate these Hy-Ram models HORIZONTALLY
690 720
700 65
710 75
710B 77
711 88

Refer to the specific model Operator’s Manual for further information on lubrication. 

Table 3 - Chisel Paste ordering information

Std. 16oz. Tube
AutoLube I*

17.6 oz. Cartridge
AutoLube II

Bulk Containers Carrier
Mounted System

12 Tubes
 (#100057)
12 Cartridges
(#100059)
35 lbs. (5 gallon)
(#676698)
36 Tubes
(#100058)
36 Cartridges
(#100060)
120 lbs. (keg)
(#679968)

* 16 oz. Tube will fit standard hand operated grease guns.

 

Updated: 8/14/2003 1:49:30 PM
Questions? Contact Us  
Equipment descriptions and specifications are subject to change without notice.
http://www.AlliedCP.com

 

Allied Construction Products, LLC • 3900 Kelley Avenue, Cleveland, Ohio 44114 • Tel: (216) 431-2600 Fax: (216) 431-2601